Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Execution and installation of metal structure and equipment – Sturm Gruppe, Germany

Auto
Execution and installation of metal structure and equipment

Execution and installation of metal structure for 5 accumulator platforms/lines (CC41-CC45). The project started in the middle of 2022 and was completed in January 2023. For the last platforms, we were also responsible for the installation of the corresponding equipment.

5 identical platforms:

  • Cell cover system (positioning, reassembly, leveling)
  • Fan substructure + fan installation (with welding on steel beam)
  • Air handling unit (without ducts)
  • Paint hoses
  • Tray system on metal structure for operator panel
  • Gratings on metal structure
  • Control units for hot and cold water (pipes not included)
  • Sub-distributors for air supply
  • Air supply pipes (Festo CQ plastic pipe)
  • Supports for workpieces on conveyor

 

Client: Sturm Gruppe, Germany
Type of works: Production and installation of metal structure
Location: Leipzig, Germania
Duration: 2022-2023

LET’S GET TO KNOW EACH OTHER

Do you need a reliable partner to accompany you throughout the entire work process, from idea to assembly? We are here for you.

Group 65